|
|
Haiti - Reconstruction : Inauguration of a bridge over the river Courjolle (Arcahaie) 18/04/2014 10:30:00 Destroyed in October 2012, following the passage of Sandy, this bridge has a metallic structure of a range of 40 m, was rebuilt in less than 10 months at a cost of 1,009,977 U.S. dollars, by the Haitian government, with the support of the French Development Agency (AFD). In his remarks for the occasion, the Head of State, thanked the various actors involved in the reconstruction of the bridge and urged the population of the area, as well as all users of the road, to protect the bridge . President Martelly reiterated on this occasion, its willingness to continue to work with all his might "until the sun rises on the development of Haiti." HL/ HaitiLibre
|
Why HaitiLibre ? |
Contact us |
Français
Copyright © 2010 - 2024 Haitilibre.com |