|
Download the School calendar 2024-2025 (Official) |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|||||||
|
![]() Haiti - Reconstruction : Official opening of the new bridge on the Road 9 30/07/2016 09:55:18
This new infrastructure estimated to just over $ 1.2 million in modular steel structures (imported) was assembled and installed by the Haitian company Vorbe & Fils. It is a metal structure 61 meters of range, divided into two spans of 30.5 meters and a width for the passage of vehicles of 7.40 meters. A pedestrian bridge of 1.30 meters wide is attached to the bridge, the latter having a carrying capacity of 60 tons (3 times superior to previous bridge). The engineer Grelon Jean-Pierre specifies that this metal bridge must be subject to regular maintenance (the old bridge had not been maintained), in order to check the welds and bolts, to prevent the premature deformation of steel structures. Jean Hislain Fréderic, the new mayor of the commune of Cité Soleil, suggesting the central authorities to take measures to tax all vehicles and heavy vehicles crossing the bridge in order to release funds for maintenance of the new bridge . See also : https://www.icihaiti.com/en/news-17442-icihaiti-flash-causes-of-the-partial-collapse-of-the-bridge-over-the-riviere-grise.html https://www.icihaiti.com/en/news-17166-icihaiti-politic-construction-of-a-temporary-bridge-onroute-9.html https://www.icihaiti.com/en/news-16913-icihaiti-flash-bridge-collapse-on-riviere-grise.html HL/ TB/ HaitiLibre
|
|
![]() |
Why HaitiLibre ? |
Contact us |
Français
Copyright © 2010 - 2025 Haitilibre.com |