|
Download the School calendar 2023-2024 (Official) |
|
Haiti - NOTICE : Scheduled power outage 26/07/2013 13:19:38 Indeed, the activities of pruning to the Street Monseigneur Guilloux, in the vicinity of the substation of Rivière Froide, in Bois Verna, to the Street Ducoste, Street Piquant, and the replacement of a concrete pole at the Rue Saint Honoré, are planned in order to make more reliable and protect the 69 KV transmission lines. The EDH relies on the cooperation and understanding of the population so that these works are performed in the best conditions and in a timely manner. HL/ HaitiLibre
|
Why HaitiLibre ? |
Contact us |
Français
Copyright © 2010 - 2024 Haitilibre.com |